Roles & Responsibilities
- Make sure that any activity offered for his inspection has an approved shop drawing, method statement (MS), Quality Control Procedure (QCP) and Inspection and Test Plan (ITP).
- Carry out all planned site inspections per the intervention points marked in the relevant ITP.
- All site inspections shall be done via an official Inspection and Test request (ITR) submitted by the Contractor through the proper channels.
- Inspection status shall be recorded in the ITR and any relevant check sheet per the approved QCP. Any outstanding items shall be verified before closing the ITR. If the Contractor excludes an item from an ITR, the thing will be dealt with/inspected utilising the ITR from which the item was excluded.
- Verify with the Independent Testing Laboratory (ITL) that all relevant test results related to specific ITR meet the project requirements.
- Suppose he notices that the relevant Shop Drawing, materials used, MS, QCP and ITP do not cover all specification requirements. In that case, he should report the same in writing to the Discipline Manager. Copy of such report shall be forwarded to Company project manager.
- Closely monitor site activities to ensure the quality of work complies with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report to the Electrical Manager.
- Ensure all materials comply with the approved Material Approval Request (MAR).
- Make sure that the Contractors personnel are using the latest edition of the approved shop drawings, MS, QCP and ITP as per the project master index. Also, ensure the Contractor complies with the newest authority regulations.
- Ensure that any site observations and non-conformity have been reported through a Site Observation Report (SOR) and Nonconformance Report (NCR), reviewed by his line supervisor. All SORs and NCRs shall be coordinated with the PMC Senior Quality Assurance Engineer.
- Monitor related activities and site safety adherence by local authorities, standards and project regulations, and report any observed violations to the HSE Engineer.
- Advise the Planning Engineer and Discipline Manager of any slippage of Progress regarding site activities.
- Participate with PMC disciplines in reviewing the Close Out Report submitted by the Contractor.
- Review the relevant As-Built drawings submitted by the Contractor and make sure that all site conditions are adequately addressed.
- Informs themselves of the relevant Quality, Environmental, Safety and Occupational Health Policies, Manuals and Procedures within Hill International and ensures continued compliance with these requirements while employed by Hill.
- Perform other duties as assigned by the line manager/supervisor.
- Managing and overseeing all mechanical aspects of construction projects from start to finish.