Witness various inspection/testing related to CP system prior to backfilling and after back filling.
Inspect installation of CP transformer/rectifier.
Inspect installation of heat tracing circuits and associated components.
Witness testing of heat tracing circuits prior to insulation and after cladding.
Witness inspection and tests related to equipment such as diesel generators, HVAC equipment etc.
Witness inspection/testing related to overhead power distribution/transmission lines.
Perform initial detailed inspection of certified electrical equipment based on latest IEC 60079-17 table 1,2,3 and IEC 60079-14, or perform visual or close inspection as applicable.
Correct interpretation of equipment labels, IP Rating etc.