Find jobs
Companies
Categories
Experience Levels
Cities
Industries
Job Types
Workplaces
Home
My jobs
Work location
On-Site
Remote
Hybrid
Experience
Internship
Entry level
Associate
Mid-Senior level
Director
Executive
Country
UAE
Saudi Arabia
Qatar
Egypt
Kuwait
Iraq
Oman
Bahrain
Jordan
Lebanon
City
Dubai
Abu Dhabi
Riyadh
Cairo
Doha
Khobar
Jeddah
Sharjah
Basra
Dammam
Al Khor
Al Ain
Job Type
Full-time
Part-time
Contract
Temporary
Volunteer
Other
Free job posting with access to all our channels? Mail us on navtej@myslate.co
Blog
Privacy policy
Terms of use
AIGCC Group
Procurement Manager
Developing and implementing procurement strategies that align with the company’s objectives.Managing supplier relationships to ensure compliance with contracts and resolution of issues.Conducting and analyzing market research to identify potential vendors and suppliers.Negotiating terms and conditions with suppliers to ensure the best possible prices and agreements.Overseeing the procurement process from the initiation of a purchase request to the final receipt and approval of goods.Coordinating with internal departments to forecast needs and specifications.Managing the procurement budget and preparing cost analyses and reports.Maintaining an up-to-date knowledge of the industry's market trends and developments
Posted 4 months ago
Land Surveyor
Initial establishment of benchmarks and all the stations as the reference. Based on these operations the horizontal and the vertical control is established.The angles between the survey lines created have to be measured.All the details of the survey are explained and located based on the stations and the lines between the stations. The details are the streams, buildings, milestones, streets and any other natural or man-made features present in the area surveyed.For the constructions works related to buildings, culverts, sewers, bridges, and water supply schemes the lines have to set out and the grades are established by the surveyor.Height or the elevation of certain points are determined by surveying by the surveyor. Or in either case, specific points have to be established in required elevations.Carrying out topographic surveying. This is the surveying of contour of the given land which involves both vertical and horizontal controls.Parallel lines and perpendicular lines have to be established.The inaccessible points have to be measured.To conduct survey past the obstacles. Many miscellaneous field works based on the trigonometric and the geometric principles have to be conducted.Determination of the meridian, latitude, and longitude or to determine the local time by carrying out observations on the sun or a star.Surveyor use liberal number of sketchesEach day of survey work must end up with a brief note. This must have the title of the work, the date of survey, the conditions of weather, the personnel involved, the list of the instruments and the equipment used.It is recommended not to erase. If a mistake is made, rule through the mistake and the corrected value is marked above it.The daily notes created must be signed.
Any time
Experience level
On-site/remote
Job type
Premier Class
Sr. Document Controller
RAPID BUILDING GENRAL CONTRACTING (MABANI) LLC
Project Engineer
Galfar Engineering and Contracting WLL Emirates
Site Administrator
Golden Spectrum Building contracting LLC
Civil Engineer
Mustasharcom for Informatics Solutions
Senior IT Project Manager