Job Type
Work Type
Location
Experience
Inspection and Partial maintenance of existing civil associated cooling water structures. The structures are exposed to sea water as well as buried, which need to be excavated and repaired.
Partial maintenance includes – Blasting, skin repair, deep skin repair, crack injection, grouting, v-groove cutting and re-painting of the concrete structures.