Job Type
Work Type
Location
Experience
A. QUALIFICATIONS:
B. RESPONSIBILITIES / PROFILE:
Reports operationally to the Area Lead and functionally to Design Unit Head with following responsibilities / profile:
(i) Develop Site Plans and Infrastructure Layouts:
- Develop comprehensive site plans and infrastructure layouts for oil and gas facilities, ensuring optimal land use and functionality.
(ii) Perform Civil Routing Studies:
- Conduct routing studies for essential infrastructure components such as roads, drainage systems, and utility corridors.
(iii) Establish Structural Configuration:
- Establish configurations for structural elements such as foundations, retaining walls, and support structures.
(iv) Pro-active, Co-operating, and Dutiful:
- Exhibit a proactive approach, cooperate effectively with team members, and fulfill duties with diligence and responsibility.
(v) Perform 3D Infrastructure Modelling:
- Perform 3D modelling of infrastructure components using software like Civil 3D or Revit to visualize and optimize designs.
(vi) Perform Civil Modelling Using 3D Tools:
- Utilize 3D tools to model civil structures and supports based on engineering studies and project requirements.
(vii) Incorporate Modifications and Changes:
- Route minor infrastructure lines and incorporate necessary modifications and changes into the design.
(viii) Perform Various Checks:
- Conduct various checks such as clash detection and compliance verification to ensure design integrity and safety.
(ix) Produce Civil-Related Drawings:
- Produce detailed civil-related drawings, including site plans, sections, and construction details.
(x) Extract Drawings from the 3D Model:
- Extract construction and general arrangement drawings from the 3D model for use in project execution.
(xi) Perform Material Take-Off (MTO):
- Perform material take-off for civil components to ensure accurate estimation and procurement.
(xii) Coordinate with Other Designers/Engineers:
- Coordinate with other designers and engineers to ensure interdisciplinary alignment and project coherence.
(xiii) Report Progress of Work:
- Regularly report the progress of work to project managers and stakeholders, highlighting key achievements and challenges.
(xiv) Review and Comment on Vendor Drawings:
- Review and provide comments on vendor drawings to ensure compliance with project specifications and standards.